The Savings

Less clinker. Lower cost. Same strength.

So what if you could use less of it? With Sonocrete you can reduce clinker content by up to 30% while keeping equivalent early strength.

Estimate your savings

Estimate

Move the slider to your monthly volume. The benchmark rates behind this estimate are set by our team and updated as new trial data lands.

2.000
Assumed cement content300 kg per m³
Assumed cement cost180 per tonne
12.960estimated cement savings per month
734 tCO₂ avoided per year

Indicative only. Actual savings depend on your recipe, cement, and plant.

What operators are seeing

Case studies

Decarbonisation

Every tonne of clinker you avoid is a real CO₂ saving

Using less clinker cuts material cost and carbon at the same time. The concrete still performs to specification.

850 kg

CO₂ per tonne of clinker avoided

Ready to move?

Let us talk about your plant